Reading a software proposal: the red flags and the questions that expose them
TL;DR
Difficulty: Beginner
Three proposals with three prices describe three different projects until you make them comparable.
- Read for what is missing: named people and subcontractors, exclusions, running costs, testing, data protection, accounts, support and exit.
- Count three years, not the build price, and price every exclusion.
- Every account (domain, hosting, code, payments) belongs in your name, and the code must be assigned or licensed to you in writing.
- Score each area with weights, keep cost next to the score, and send each supplier your questions in writing.
What to read first
Three proposals came back, and the prices are miles apart. Before you negotiate from the lowest, spend an hour making them comparable. This chapter shows what to read for, the questions that expose what a proposal leaves unsaid, and a comparison table you can copy, worked through for an invented clinic group in Manchester.
Three prices are three different projects
You sent out a good brief. Three proposals came back. One says £19,500, one says £38,000, one says £52,000. The natural move is to put the three numbers side by side and start negotiating from the lowest. Resist it for an hour.
A software proposal is each supplier's guess at what you asked for, minus what they decided to leave out, plus running costs that may sit on another page or on none. Until you know what each includes, who does the work, what it costs over three years and who owns the result, the three numbers describe three different projects.
This chapter is the hour you spend before negotiating: what to read for, the questions that expose what a proposal leaves unsaid, and a comparison table you can copy. If you have not written your brief yet, start with writing a software brief a developer can quote on, because a vague brief produces proposals that cannot be compared at all.
Example: the three proposals on Rachel's desk
Rachel runs Calder Physio, three physiotherapy clinics in Manchester (calderphysio.example). Her brief asked for online booking across the three clinics, a patient portal, card payments for self pay patients, reminders by email and text message, and an export of payments for the accounts. Three suppliers replied. All three are invented for this series, so I call them by letter.
- Proposal A, from an agency of about 40 people: £38,000 to build, plus managed hosting at £450 a month. Eleven pages, mostly about the agency.
- Proposal B, from a studio of two developers: £52,000 to build, hosting in Calder Physio's own cloud account at about £120 a month, and a support retainer of £600 a month. Six pages, mostly about her clinics.
- Proposal C, from a company with its own booking platform: £19,500 to set up, plus a licence of £690 a month. Two pages and a price list.
On price alone, C wins by a distance. The rest of this chapter takes the three apart, one question at a time.
The first test: did they understand your problem?
Before any detail, read the first page of each proposal and ask one thing: could this page have been sent to anyone else? A supplier who understood your problem will repeat it back in your words, name the awkward parts, and ask questions you had not thought of. A supplier who did not will describe their process, their awards and their values.
Questions before a proposal are a good sign. Booking software for three clinics has real traps: a physiotherapist who works at two sites, a late cancellation, an insurer who pays some appointments and not others. A supplier who never asked has priced a generic booking system, and the gap will turn up later as change requests.
Example: two opening paragraphs
Proposal A opens: "We are a full service digital agency passionate about delivering exceptional experiences. Our proven process takes you from discovery to launch." Nothing in it is wrong, and nothing in it is about Calder Physio.
Proposal B opens: "You want patients to book themselves at any of your three clinics, without the front desk phoning round. The tricky parts are practitioners who move between Didsbury and Chorlton, the 24 hour cancellation charge, and patients whose insurer pays directly. We asked about those on our call and have priced them in." That paragraph tells Rachel the supplier listened, and it tells her what they think is hard. She can check both.
Proposal C has no opening paragraph. It has a feature list. Rachel scores the three on understanding: A gets a 3 out of 5, B a 4, C a 1.
Who will actually do the work
The people in the pitch meeting are often not the people who write the code. That is normal in a larger business and not a problem in itself. The problem is not knowing. Ask, in writing:
- Who are the named people who will design, build and test this, and how much of their week is it?
- Will any of the work be subcontracted, to whom, and in which country?
- If the lead developer leaves, what happens?
There is a legal angle when personal data is involved. Under UK GDPR, a supplier who processes personal data on your behalf (a processor) may not bring in another processor without your prior written authorisation1. Patient records are health data, which the law treats as a special category with extra protection2. So if a subcontractor will touch Calder Physio's patient data, Rachel must know who they are and agree to it before it happens. If the subcontractor sits outside the UK, it may also be a restricted transfer with its own paperwork, which the article on vetting vendors and transfers under UK GDPR walks through.
Offshore teams are not the issue. Plenty do excellent work. An undisclosed one is, because you cannot authorise what you do not know about.
Example: Rachel asks Proposal A who writes the code
Proposal A lists a client director, a project manager and "our development team". Rachel writes back: "Please name the developers and tell me whether any work is subcontracted." The answer: the build will be done by "a trusted delivery partner", a company in another country the agency has worked with for years. The project manager in Manchester is the only named person.
That changes three things. Rachel needs the partner named in the data processing agreement and agreed in writing. She needs to know whether patient data will be visible to the partner, and if so, whether that is a transfer outside the UK. And she needs to know who answers when the partner misunderstands a booking rule, because her contract is with the agency. None of this rules A out. It makes A's team "unclear until answered": 2 out of 5 for now.
What is excluded is where the second invoice lives
Every proposal has assumptions and exclusions, sometimes in a clear section, sometimes scattered, sometimes missing. Read them twice. Whatever is excluded is work you will do yourself, pay for later, or nobody will do.
The usual suspects in a project like this:
- Data migration. Moving existing patients, appointments and notes from the old system. Often excluded, rarely small.
- Content. Clinic descriptions, practitioner profiles, photos, terms and policies.
- Third party charges. Text messages, email sending, payment fees, map services.
- Integrations "to be scoped". A phrase that means "we have not priced this".
- Later phases. Anything parked as "phase two" is not in the price, however reasonable it sounds.
- Changes. How a change request is priced, and who decides what counts as a change.
The test is simple: for each exclusion, write down who does it and roughly what it costs. If nobody knows, ask the supplier for a number.
Example: turning exclusions into pounds
Proposal A excludes migrating patient records from Calder Physio's current booking system and moves the accounts export to "phase two". Rachel asks for both prices: migration £4,000, the export £6,500. Text message charges are passed through at cost, about £40 a month at her volumes.
Proposal C includes up to 1,000 text messages a month in the licence. But its platform has no accounts export and no patient portal of the kind she described, and "customisation beyond the standard templates is charged at £95 per hour". C estimates 80 hours to get close to her brief, which is £7,600.
Proposal B includes migration and the export, and passes text messages through at cost, the same £40 a month. Its exclusions list is short and specific: content and photos are Rachel's, and any new integration not in the brief is quoted as a change. On scope, Rachel scores A a 2, B a 4 and C a 2.
Count three years, not the build
The build price is the number on the cover. The number that matters is what you pay to own and run the thing for its first few years: hosting, licences, support, third party charges, and the work that was excluded. Three years is a sensible horizon for a first system. It is long enough for the running costs to show, and short enough to estimate honestly. The article on the true cost of outsourcing development goes deeper into total cost of ownership.
Put every line in the same table, monthly costs multiplied by 36, and add the excluded work you now have prices for.
Example: the three proposals over 36 months
All figures are invented for this example.
| Cost | Proposal A | Proposal B | Proposal C |
|---|---|---|---|
| Build or set up | £38,000 | £52,000 | £19,500 |
| Hosting or licence, 36 months | £16,200 (£450 a month) | £4,320 (£120 a month) | £24,840 (£690 a month) |
| Support, 36 months | included in hosting | £21,600 (£600 a month) | included in licence |
| Excluded work, priced | £10,500 (migration and export) | none | £7,600 (80 hours customisation) |
| Text messages, 36 months | £1,440 | £1,440 | included |
| Three year total | £66,140 | £79,360 | £51,940 |
Line by line for B: £52,000 plus £4,320 plus £21,600 plus £1,440 makes £79,360. The gap between A and B is £14,000 on the cover and about £13,200 over three years, and B's retainer includes six hours of changes a month, which A's hosting does not.
C is still the lowest. But everything sits on C's platform, under C's licence, and the day Calder Physio stops paying, it has nothing to take away. That is the exit question, later in this chapter.
Testing: ask what is written, not what is promised
Almost every proposal says the software will be "thoroughly tested". That sentence costs nothing to write. Ask instead what exists: which tests, run when, and what happens when one fails.
The useful questions:
- Do you write automated tests, and do they run on every change, not only before launch?
- Which parts of the system are covered: the booking rules, the payments, the reminders?
- Can a release go live if a test fails?
- Is there a staging site, a copy of the system where I can try each change before patients see it?
- Do I get release notes that say what changed?
If the vocabulary is new, the series on testing explains it from the start: test driven development (writing the test before the code) and the critical path in software, the short chain of steps, like booking and paying, that must never break. For what it is worth, this is how I work: test first, every release through a test gate, every release recorded in a release register, and the verified critical paths frozen behind an approval step.
Example: three answers to the same question
Rachel asks all three: "What tests will you write, and how is each release checked?"
- A: "Our QA team tests every release thoroughly before it goes live." That is a habit described in one line. Rachel follows up: "Manual or automated, and can I see the test plan?" The answer is mostly manual, with a checklist.
- B: "Every booking and payment rule gets an automated test before the code is written. The tests run on every change, and a release cannot go out if one fails. You get a staging site and a short note with each release." Rachel asks for one example test, written in plain words, and gets it the next day.
- C: "Our platform is used by hundreds of clinics every day." That says the product is popular. It says nothing about how Calder Physio's customisations will be tested.
Testing scores: A gets a 2, B a 5, C a 0.
Patient data: the agreement, the location and the breach clock
A booking system for a clinic holds names, phone numbers, appointment histories and often notes about injuries. That is health data, a special category under UK GDPR2. The supplier will be your processor, and the law requires a written contract with them, a data processing agreement, that sets out what they may do with the data and how they protect it1. A good supplier sends one with the proposal or offers it without being asked.
Then there is the breach clock. If personal data leaks, the processor must tell you without undue delay, and you, as the controller, must report it to the regulator within 72 hours of becoming aware of it, unless the breach is unlikely to put anyone at risk3. Your contract should give the supplier a much shorter deadline to tell you, so you have time to act.
Security deserves one plain question too: how do you check each release for the common weaknesses? The OWASP Top 10, a widely used list of the most critical security risks in web applications, is a fair benchmark to name4. The article on evidencing compliance shows what that evidence looks like per release.
Example: Rachel's data questions
Rachel sends the same six questions to all three suppliers:
- Please send your data processing agreement before we sign anything else.
- In which country, and with which hosting provider, will patient data be stored, including backups?
- Which subprocessors will have access to patient data? Please list them by name.
- How quickly will you tell me about a suspected breach? (She asks for 24 hours in the contract.)
- Who at your company can see patient records, and is that access logged?
- How is each release checked for security problems?
A and B send agreements within two days. B stores data in a UK region of a large cloud provider, in Calder Physio's own account. A uses its own managed hosting in the UK, but now has to add the delivery partner as a subprocessor. C's agreement is a standard one that allows subprocessors to be changed "from time to time" with notice on its website, and its backups sit in another country. Rachel scores data protection: A a 3, B a 4, C a 1.
Every account in your name
Software lives in accounts: the domain, the hosting, the code repository, the payment provider, the email and text message services, the analytics. Whoever holds them holds your business. A supplier who sets everything up in their own name is usually just saving time. But it means that leaving them means asking permission.
The rule is simple. Every account is opened in your company's name, with your email address as the owner, and the supplier is added as a user with the access they need. Passwords live in a shared password manager that you control. If an app store account is ever needed, it is yours too. Apple, for example, enrols organisations under their legal entity name and requires a DUNS number from Dun & Bradstreet to verify the company5, which takes time, so start early.
Example: the account list for the clinics
| Account | In whose name | Supplier's access |
|---|---|---|
| Domain calderphysio.example | Calder Physio Ltd | none needed, DNS changes on request |
| Hosting | Calder Physio Ltd, billed to Rachel's card | administrator user, removable |
| Code repository | Calder Physio's organisation | developer users |
| Payment provider | Calder Physio Ltd (the money lands with her) | developer access to test mode only |
| Email and text message services | Calder Physio Ltd | technical user |
| Analytics | Calder Physio Ltd | read and configure |
| Password manager vault | Rachel, as owner | shared folder |
Proposal B's plan matches this table already. Proposal A runs hosting in its own account but agrees to put the domain, repository and payment provider in Calder Physio's name. Proposal C runs everything on its platform, including the payment account, so patient payments flow through C before they reach Rachel.
Support: response is not repair
After launch, support terms decide how bad a bad day gets. Look for two different times: response (someone acknowledges the problem) and resolution or workaround (patients can book again). Good terms define severity levels in plain words, say when the clock runs, and give both times for each level.
Example: Friday at 5pm
Online booking stops working at 5pm on a Friday. Proposal A promises "a response within one business day". The first response could come at 5pm on Monday, after a weekend of patients failing to book. Proposal C promises "best efforts". Proposal B's terms read:
| Severity | Meaning | Response | Workaround or fix |
|---|---|---|---|
| Critical | booking or payments down for everyone | 1 hour, 8am to 8pm, seven days | 4 hours |
| High | one clinic or one feature broken | 4 business hours | next business day |
| Normal | something wrong, a way round exists | 1 business day | next planned release |
| Low | cosmetic, or a question | 2 business days | agreed together |
Rachel's clinics open on Saturdays, so she asks A whether weekend cover is available and at what price. Team and support scores, combining this with the earlier answers: A a 2, B a 5, C a 2.
Exit, handover and the words "we own the code"
Ask every supplier how you would leave them. The answer shows what you are actually buying. You want to read that you will receive the source code, the documentation, a full export of your data in a standard format, and reasonable help to hand over to someone else.
Then read the ownership clause. By default, the law does not give the customer the copyright in software they commissioned. In the UK, the author of a work is its first owner, and the employer only owns what its own employees create in the course of their job6. A supplier's code therefore belongs to the supplier unless it is assigned to you, and an assignment of copyright only takes effect if it is in writing and signed by or on behalf of the supplier7. If the contract says nothing, you may have a licence to use the software, but not the right to take it elsewhere and have someone else change it. The next chapter, who owns the code, covers this properly. This article is general information, not legal advice. For a contract that matters, have a solicitor read it.
As one example of a plain clause: my own terms for development work say that bespoke code and design paid for in full become the client's intellectual property immediately on payment, while open source frameworks such as Ruby on Rails and Solidus stay under their own licences, and my own pre existing libraries and tools are not part of that transfer8. That last part is normal: no supplier hands over the tools they use for every client.
Example: reading Proposal C's ownership clause
Proposal C's terms say: "All intellectual property in the platform, including any customisations made for the client, remains with the supplier. The client receives a non exclusive licence to use the platform for the duration of the subscription." In plain words: Rachel pays £7,600 for customisations she will never own, the licence ends when the subscription ends, and nothing in the terms promises an export of patient and appointment data in a format another system can read.
That is fair for a subscription, as long as Rachel knows she is buying one. She asks C two questions: "In what format can I export all patient, appointment and payment data, and how often?" and "What notice period applies if I leave?" Ownership and exit scores: A a 3 (code assigned on final payment, hosting must be migrated out), B a 5, C a 0.
References you can actually call
Case studies are marketing, written about the supplier's best project. A reference is a person you phone, ideally from a project like yours that finished at least a year ago. Ask each supplier for two, and ask questions that cannot be answered with a compliment.
Example: Rachel's four reference questions
- What went wrong during the project, and what did they do about it?
- Did the final cost match the proposal? If not, where did the difference come from?
- If something breaks today, how fast do they answer, and who answers?
- If you wanted to move to another supplier tomorrow, could you take the system with you?
The reference for Proposal B, a dental practice in Leeds, says the project ran three weeks late because of an integration, that the supplier told them early, and that the price held. The answer to question four is "yes, it is all in our accounts". That is the sound of a supplier who plans for being replaceable.
A price far below the others needs an explanation
When one proposal is far below the rest, ask why before you feel lucky. Public buyers in the UK are allowed to disregard a tender whose price they consider abnormally low, but only after telling the supplier and giving them a reasonable chance to show they can do the work for that price9. You are not bound by procurement law, but the habit is a good one: a very low price deserves a written explanation.
Sometimes the explanation is good. A supplier adapting an existing product really can charge less than one building from scratch, and buying is often the right answer (the build, buy or adapt choice from the first chapter). The trouble starts when a rented product is presented as a build, or when the price only works because testing, migration or support were left out.
Example: checking the lowest price
C's £19,500 is about half of A's £38,000 and well under half of B's £52,000. Rachel asks C to explain. The answer is honest: C's platform already exists, and the set up fee covers configuration and branding. So C is not a lower cost build, it is a different thing: a subscription. Rachel judges it as one. Against her brief it misses the patient portal and the accounts export, it keeps her payments in its account, and she owns nothing at the end. For her, it is out. For a single clinic with simpler needs, the same proposal could be the right choice.
The red flags on one page
Each of these does not mean "never". It means "ask, in writing, and decide on the answer":
- No questions about your business before the proposal arrived.
- Nobody named who will write and test the code, or subcontracting mentioned only in the small print.
- A price far below the others, with no explanation.
- No mention of testing, or only "thoroughly tested".
- No data processing agreement, or vagueness about where patient data is stored.
- Everything in their accounts: domain, hosting, repository, payment provider.
- "We own the code", or an ownership clause that is simply missing.
- Exclusions you cannot price, such as "integrations to be scoped".
- Support that only promises "best efforts" or a response with no fix time.
The following flow is the order I would read a proposal in, so the quickest checks come first.
Example: Proposal A through the flow
A passes the first question, just. It fails the second, and Rachel's written question gets the partner named. It fails the third on testing, and the answer (mostly manual) only partly closes the gap. It passes the fourth except for hosting. Rachel keeps A in the running, with questions still open.
A comparison table you can copy
Once the answers are in, put them in one table so you compare the same things in the same order. Score each area from 0 (missing or unacceptable) to 5 (clear, specific, evidenced). Then decide how much each area matters to you, as a weight, and make the weights add up to 1. The weighted score is:
where is the proposal's weighted score out of 5, is the number of areas you score, is the weight of area (all the add up to 1), and is the proposal's score in area , from 0 to 5. It is a weighted average, the same idea as the mean with some items counting more: Foundations: the mean.
The template, ready to copy:
| Area | Weight | What a 5 looks like |
|---|---|---|
| Understanding of your problem | repeats your problem in your words, names the hard parts | |
| Team and support | named people, subcontracting disclosed, severity levels with fix times | |
| Scope and exclusions | short, specific exclusions, each one priced | |
| Testing and quality | automated tests on every change, a failing test blocks a release, a staging site | |
| Data protection and security | agreement up front, data location named, short breach deadline, security checks per release | |
| Ownership, accounts and exit | code assigned or licensed in writing, accounts in your name, data export and handover promised | |
| Three year cost | (not scored, written next to the total) |
Keep cost out of the score and write it next to it. Mixing price into a quality score hides the trade off you actually need to make.
Example: scoring the three proposals
Rachel weights testing and ownership highest, because a booking system that breaks or that she cannot leave hurts most: understanding 0.15, team and support 0.15, scope 0.15, testing 0.20, data protection 0.15, ownership 0.20.
| Area | Weight | A | B | C |
|---|---|---|---|---|
| Understanding | 0.15 | 3 | 4 | 1 |
| Team and support | 0.15 | 2 | 5 | 2 |
| Scope and exclusions | 0.15 | 2 | 4 | 2 |
| Testing and quality | 0.20 | 2 | 5 | 0 |
| Data protection and security | 0.15 | 3 | 4 | 1 |
| Ownership, accounts and exit | 0.20 | 3 | 5 | 0 |
| Weighted score | 2.50 | 4.55 | 0.90 | |
| Three year cost | £66,140 | £79,360 | £51,940 |
For Proposal B, step by step:
where is Proposal B's weighted score, each product is one area's weight times B's score in that area, and the six products are .
The same sum gives A 2.50 and C 0.90. Now the real decision is visible: B costs about £13,200 more than A over three years and scores roughly twice as high, with the biggest gaps in testing and ownership. Whether that is worth it is Rachel's call, and she can now make it with her eyes open. If you want to see how the pricing model changes who carries the risk of overruns, the chapter on fixed price, time and materials or a retainer picks that up.
The questions you send back
The last step is a short, specific email to each supplier still in the running. How they answer is part of the evidence: a quick, plain reply with documents says something, and so does a week of silence followed by a call to "walk you through it".
Example: Rachel's email to Proposal A
Thank you for the proposal. Before we go further, please answer these in writing:
- Please name the developers at your delivery partner who will build and test the system, and confirm the partner will be listed as a subprocessor in the data processing agreement.
- Will patient data be visible to the partner at any point, including in testing? If so, from which country?
- Which parts of the system will have automated tests, and can a release go live if one fails?
- Can the hosting be in Calder Physio's own account, and if not, what does moving it out cost at the end?
- What does weekend cover for a critical fault cost, with a response within one hour?
- Please confirm the copyright in the bespoke code is assigned to Calder Physio in writing on final payment.
- Please give me two references I can phone, from projects that finished more than a year ago.
To Proposal B she sends three questions: the exact cloud region for backups, what happens to unused retainer hours, and a sample of the release notes. To Proposal C she sends a polite no, with thanks, because the subscription does not fit her brief.
Conclusion
Three prices are three different projects until you have made them comparable. Read for what is missing, not just for what is offered: who does the work, what is excluded, what it costs over three years, how it is tested, where patient data lives, whose name is on every account, how fast a fault is fixed, and how you would leave.
Score the answers with weights that reflect what would hurt your business most, keep the cost next to the score rather than inside it, and send each supplier your questions in writing. The supplier who answers plainly and quickly, with documents, has already shown you most of what you need to know. Once you have chosen, the next question is what you actually own: that is chapter six.