Writing a software brief a developer can actually quote on

TL;DR

Difficulty: Beginner

A vague brief gets you three guesses priced as three different projects. A good brief gets comparable quotes.

  • Twelve sections: goal with numbers, users and roles, critical journeys, requirements as stories with examples, must, should, could and will not have, integrations, data, compliance, hosting and support, timing, budget range, decision criteria.
  • Write important requirements with Given, When, Then examples so "done" is unambiguous.
  • Keep must haves under about 60% of the effort and write a clear "will not have" list.
  • Leave out solutions, colours and the tech stack unless you have a reason.
  • Send the same brief to everyone and share every answer with everyone.

Three suppliers, one sentence, three prices that cannot be compared. The fix is a brief: a few pages that tell every supplier the same thing, so the quotes describe the same project. Here is what goes in each section, what to leave out, and Lee Valley Physio's brief worked through from start to finish.

Why the brief decides what you are quoted for

You have written down the problem, what it costs you today and a budget range, as the first chapter of this series suggests. Now you want quotes, and the question is what to send.

Most people send a paragraph, and fair enough, it feels like plenty. Three suppliers read it, each fills the gaps with their own guesses, and each prices a different project. The quotes come back at wildly different figures, and you cannot tell whether the lowest is good value or simply quoting for less. You are no longer comparing prices. You are comparing guesses.

A brief stops the guessing. It tells every supplier the same thing in the same words, so the prices describe the same piece of work. It needs no technical knowledge. It needs to say who will use the software, what they must be able to do, what it connects to, which rules it follows, and how you will choose.

Example: one sentence, three quotes

Orla owns Lee Valley Physio, three physiotherapy clinics in Cork (Ballincollig, Douglas and Blackpool), with nine physiotherapists and three receptionists. Patients book by phone, reception types each booking into a spreadsheet diary per clinic, and reminders go out by hand when someone has time. Orla emails three suppliers one sentence: "We need online booking with payments and reminders for our three clinics."

The quotes come back like this. The suppliers and figures are invented for this example.

SupplierPriceWhat they assumed
A€11,000A booking plugin on the existing website, card payment, email reminders only, no patient accounts
B€44,000A bespoke booking system with patient accounts, card payments, email and text reminders, a reception view per clinic
C€110,000Everything in B, plus a link to the clinical notes system, insurer billing, a mobile app and a migration of every past appointment

None of the three is wrong. Each answered a different question, because the sentence allowed all three. Supplier A did not know that a third of Orla's sessions are billed straight to an insurer or an employer scheme. Supplier C assumed a mobile app Orla never wanted. If she picks A because it is the lowest, she will discover the missing pieces after she has paid for the first ones. The rest of this article is the brief that turns three guesses into three comparable prices.

The twelve sections of a brief that works

A good brief has the same sections whatever you are building. Each answers a question a supplier would otherwise guess:

  1. Goal. What should be different in the business, and how you will measure it.
  2. Users and roles. Who uses it, and what each kind of user may do.
  3. Journeys. The few things people must be able to do from start to finish.
  4. Requirements. What each user needs, as plain stories with an example of done.
  5. Priorities. Essential, important, nice to have, and deliberately left out.
  6. Integrations. Every other system it exchanges information with.
  7. Data and migration. What exists today and what has to move across.
  8. Compliance. Data protection, accessibility, payments, sector rules.
  9. Hosting and support. Where it runs and what happens when it breaks at 8pm.
  10. Timing. The dates that genuinely matter, and why.
  11. Budget range. What you will spend, as a range.
  12. How you will decide. Your criteria, published.

For a small project that fits on four to eight pages. Length is not the aim. Every section answered, even with "none" or "not sure yet", is the aim. A good supplier prices "not sure yet" as an open question rather than pretending it does not exist. The sections below walk through Orla's brief, one part at a time.

Start with the goal and how you will measure it

The goal is the business outcome, not the software. "An online booking system" is a thing to build. "Fewer hours on the phone and fewer missed appointments" is a goal. A supplier who knows the goal can suggest a simpler way to reach it, and can tell you when a feature will not move the number you care about.

Write down today's figure, the figure you want, and by when. If you do not know today's figure, count it for two weeks before you send the brief. A tally sheet on the reception desk gives every supplier a target to design for.

Example: the goal Lee Valley Physio writes down

Orla counts for two weeks. Her figures, invented for this example: reception takes about 70% of bookings by phone, the three receptionists spend around 45 hours a week on booking, rebooking and reminder calls, and about 9% of appointments are no shows. Her goal section reads:

Within six months of going live, at least 60% of bookings are made online, reception time on bookings falls from about 45 to under 20 hours a week, and no shows fall from about 9% to under 5%. We will measure all three from the new system's reports, against the two week count attached.

Any supplier reading that knows automatic reminders and easy online rebooking are central, and that a polished patient app nobody uses would miss the point.

Name the users and what each one may do

Software has more users than you think: customers, staff with different jobs, managers who need reports, an accountant who needs exports. Each group needs different screens and, just as important, different permissions. A receptionist sees every appointment. A patient sees only their own.

List each kind of user (developers call these roles), what they need to do, what they must never be able to do, and roughly how many there are. Ten users and ten thousand users are different projects.

Example: the users and roles at Lee Valley Physio

RoleRoughly how manyNeeds toMust not
Patient (self pay)about 2,500 of the 3,800 active patientsBook, pay, rebook, cancel, see own appointments and receiptsSee anyone else's details
Patient (insured)about 1,300, a third of the totalBook with insurer name and authorisation number, no card payment at bookingBe charged by card for an insured session
Physiotherapist9See own diary across clinics, block out time, mark a patient as attendedChange prices or refunds
Receptionist3See all diaries for their clinic, book phone patients, take payment, refund up to a limitExport patient data
Owner (Orla)1Everything, including prices, opening hours, reports and larger refunds
Accountant1, externalDownload a monthly export of payments and insurer sessionsSee clinical details

The table took Orla twenty minutes, and it is grand as it is. It answers questions a supplier would otherwise ask in a meeting, or never ask.

Describe the journeys that matter most

A journey is one complete thing a person does with the software, from the first click to the result. Journeys show the supplier how the pieces join up, and a few of them are the ones your business cannot afford to have broken. That set is often called the critical path, and I have written about finding and guarding the critical path separately.

Describe three to six journeys step by step, in your staff's words, and mark the critical ones.

Example: three journeys at the Cork clinics

Journey 1, critical: a new self pay patient books and pays. The patient chooses a clinic and "first appointment, 45 minutes", sees free slots for the next four weeks, picks one, enters name, date of birth, mobile number and email, accepts the cancellation policy, pays €60 by card and gets a confirmation by email and text at once. The slot disappears for everyone else at that moment.

Journey 2, critical: a patient rebooks or cancels. From the link in a reminder, the patient moves the appointment to another free slot or cancels it. Late cancellations follow the policy written out in the next section.

Journey 3: reception books a patient who phoned. The receptionist finds or creates the patient, books the slot, and either takes a card payment on the payment provider's own screen or marks the session as insured with the authorisation number.

Every supplier now knows that slots must never be double booked, that payments and reminders are core, and that phone bookings still happen.

Write requirements as stories, with an example of done

A requirement says what one user needs. The most common plain language format is the user story: "As a [type of user], I want to [do something], so that [reason or benefit]."1 It is useful because it forces three things into every line: who, what and why. The why is what suppliers most often lack, and it is what lets them suggest something simpler.

A story alone is still open to interpretation. Ron Jeffries, one of the shapers of extreme programming, described a user story as three things: the card that names it, the conversation that fills in the detail, and the confirmation, the acceptance tests that show when it is done.2 In a brief, the confirmation is the part to write down. Add one or two concrete examples to each important story as Given (the starting situation), When (what the person does) and Then (what should happen). The Cucumber documentation describes the same structure: Given sets the initial context, When describes an event or action, Then describes the expected outcome.3 No tools needed, plain sentences are enough. My article on behaviour driven development shows how those examples later become automated tests.

Example: a weak and a strong version of the same requirement

Orla's first draft:

Patients should be able to cancel online easily.

It reads fine and is almost useless for pricing. Can patients cancel at any time? Is there a fee, taken from which card? What about insured patients, who did not pay by card? Each supplier will answer differently, and each answer changes the price.

The same requirement, rewritten:

Story. As a patient, I want to cancel or move my appointment online, so that I do not have to phone during clinic hours and someone else can have the slot.

Rules. Cancelling or moving more than 24 hours before the start is free. Cancelling less than 24 hours before costs 50% of the session price. Insured patients are never charged a fee online. Reception is told instead.

Examples.

  • Given a self pay appointment at 10am on Thursday, paid €52, when the patient cancels at 9am on Wednesday, then €52 is refunded to the card and the slot shows as free in the physiotherapist's diary.
  • Given the same appointment, when the patient cancels at 3pm on Wednesday, then €26 is refunded, €26 is kept as the cancellation fee, and the receipt says so.
  • Given an insured appointment at 10am on Thursday, when the patient cancels at 3pm on Wednesday, then nothing is charged, the slot becomes free, and reception gets a task to follow up under the insurer's rules.

The second version is longer, and it is the one a supplier can price. Writing it also exposed a decision Orla had not made: the fee only works as a partial refund because patients pay when they book. Better to find that in the brief than in month three of the build. Write requirements at this depth for the critical journeys and for anything involving money, deadlines or rules. The rest can stay as one line stories.

Sort everything into must, should, could and will not

Every brief holds more wishes than the budget can carry. Prioritising openly is how you stay in control of what gets cut. The method most suppliers recognise is MoSCoW, from the DSDM agile framework maintained by the Agile Business Consortium, which sorts every requirement into four groups4:

  • Must have. The minimum usable subset. Without these, the software is not worth launching.
  • Should have. Important but not vital. There is a workaround, even if it hurts.
  • Could have. Wanted, with less impact if left out. The main pool of contingency, the first to go when time or money runs short.
  • Will not have this time. Agreed to be out of scope for this phase, written down so it does not creep back in.

The consortium adds a rule of thumb worth putting in the brief: keep must haves to no more than about 60% of the estimated effort, with a pool of could haves of around 20%, so surprises can be absorbed without missing the date.4 You cannot know the effort before suppliers estimate it, so ask each one to estimate per requirement and to say whether your must haves fit within 60% of their total.

The "will not have" list is the least expensive protection you will ever get against scope creep, the slow growth of a project through small, reasonable sounding additions. It is the same principle behind my own Task Outsourcing terms: each task is agreed in writing, and anything not expressly agreed is out of scope. Clarity about what is out protects both sides.

Example: the priorities Orla sets

PriorityRequirements
Must haveOnline booking and rebooking for all three clinics, card payment for self pay patients, insured bookings with authorisation number, cancellation rules, email and text reminders 48 hours and 2 hours before, reception and physiotherapist diary views, monthly export for the accountant
Should havePatient account with past appointments and receipts, a waiting list that offers freed slots by text, refund limits per role
Could haveGift vouchers, a short questionnaire before the first appointment, a review request after the third session
Will not have this timeLink to the clinical notes system, a mobile app, insurer billing from the system, video consultations

When the suppliers estimate, the effort splits roughly as in the chart. The figures are an invented example.

Bar chart of an invented example. Must have requirements take 55% of the estimated effort, should have 25% and could have 20%. The must haves stay under the 60% guideline. Tap or click to open full screen and move around

Must haves at 55% sit within the guideline. Had one estimate put them at 80%, Orla would know before signing that there is no room for surprises, and that something has to move from must to should, or the date has to move.

Check every line before it goes in

Weak briefs fail in two ways. Some lines name a solution instead of a need ("use a calendar plugin"). Others state a need with no way to tell when it is met ("fast", "easy", "modern"). This check takes a minute per line and catches both.

Tap or click to open full screen and move around

Example: three lines through the check

"The booking page must load fast." A need, but nobody can tell when it is done. Orla adds: "Given a patient on a mobile phone with a normal 4G signal, when they open the booking page, then the free slots appear within three seconds." Needed on day one: must have.

"Use the same calendar plugin as our website." A solution. The need behind it is that website and booking should feel like one business. Rewritten: "Patients move from the website to booking without feeling they have left Lee Valley Physio: same logo, colours and fonts", with the brand guidelines attached. Important, not essential: should have.

"Patients can buy gift vouchers." A clear need, with an example of a €50 voucher redeemed against a €60 session. Not needed on day one: could have.

List every integration, even the dull ones

An integration is a connection between your new software and another system: the payment provider, the text message service, your accounting software. Integrations are where estimates most often go wrong, because each depends on someone else's system and documentation. A supplier who does not know about one cannot price it, and will meet it later as a change request.

For each system, write what flows, in which direction, how often, and whether you already have an account. If you do not know whether a system offers a way to connect (an API, an application programming interface), say so. That is a fair question for the supplier.

Example: the integrations on the list

SystemDirectionWhat flowsNotes
Card payment providerBoth waysPayments, refunds, cancellation feesNo account yet. Supplier to recommend one, opened in Lee Valley Physio's name
Text message serviceOutConfirmations, reminders, waiting list offersAbout 2,500 texts a month
EmailOutConfirmations, receipts, remindersFrom an address at leevalleyphysio.example
Accounting softwareOut, monthlyPayments, refunds, insured sessions per insurerAn importable file is enough for phase one
Clinical notes systemNone in phase oneWill not have this time. Supplier to say whether a later link is possible

The last row matters as much as the first four. "None in phase one" stops one supplier pricing a link another left out.

Describe the data you have today

Almost every project starts with information that already exists. Moving it into the new system is data migration, and it is routinely underestimated, because real data is messier than anyone remembers: duplicates, half filled records, three spellings of the same street.

Say what data exists, roughly how much, where it lives and what has to move. Attach a small sample with personal details replaced by invented ones, so suppliers can see the mess. Never attach real customer data to a brief.

Example: the data Orla describes

About 3,800 active patients and about 600 future appointments, in three spreadsheet diaries (one per clinic) plus a patient list in a fourth. Some patients appear in more than one clinic's sheet. The 600 future appointments must be in the new system before the switch. Past appointments stay in the spreadsheets as an archive. Attached: 20 rows from each sheet, with names, dates of birth and phone numbers replaced by invented ones.

Every supplier now prices the same migration: patients and future appointments, with duplicate matching, and nothing older.

Compliance: write down the rules you live under

If the rules are not in the brief, one supplier builds them in and quotes more, another leaves them out, quotes less and leaves you exposed. You do not need to be an expert. You need to name the rules that apply and ask each supplier how they will meet them. This article is general information, not legal advice: for your own situation, check with a solicitor or the regulator's guidance.

Data protection. Under the General Data Protection Regulation (GDPR), health information is one of the special categories of personal data, and processing it is prohibited unless one of the listed conditions applies.5 The GDPR also requires data protection by design and by default: protection built in from the start, and only the data each purpose needs.6 Where processing is likely to result in a high risk, in particular large scale processing of special category data, a data protection impact assessment (DPIA) is required before it starts.7 The Data Protection Commission's guidance explains when a DPIA is needed and treats one as good practice where it is unclear.8 Name the kinds of personal data in the brief and ask where they will be stored and which other companies will process them. My article on vetting data processors goes deeper.

Accessibility. Ireland's regulations implementing the European Accessibility Act came into operation on 28 June 2025. They cover eCommerce services, defined as services provided at a distance through websites and mobile services at the individual request of a consumer with a view to concluding a consumer contract, and they exempt services provided by a microenterprise, one with fewer than 10 people and a turnover or balance sheet of no more than €2 million.9 Online booking with payment sits very close to that definition, and a practice with thirteen people is not a microenterprise, so check it rather than skip it. The standard suppliers recognise is the Web Content Accessibility Guidelines (WCAG) 2.1 at level AA.10 Ask for it by name. My article on accessibility law for online businesses covers the detail.

Payments. The Payment Card Industry Data Security Standard (PCI DSS) applies to every business that stores, processes or transmits cardholder data.11 The simplest way to keep that burden small is to require that card details are only ever entered on the payment provider's own page, never on your system. Put that in the brief and every supplier prices the same, lighter approach.

Example: the compliance section Lee Valley Physio writes

  • We handle health data: appointment types, injury notes patients type into the booking form, insurer authorisations. Please collect only what each booking needs, and tell us where all data will be stored and which other companies will process it.
  • Please say whether you think a data protection impact assessment is needed, and how you would help us with it.
  • Booking pages and patient accounts must meet WCAG 2.1 level AA. Please say how you test for it.
  • Card details are only ever entered on the payment provider's own page.
  • Every account (domain, hosting, payment provider, text message service, code repository) is opened in Lee Valley Physio's name.

The last line is about ownership as much as compliance, and the chapter on who owns the code explains why it matters so much.

Hosting and support: who looks after it afterwards

Software is not finished on launch day. It runs somewhere, it needs updates, and it sometimes breaks at the worst moment. A brief that ignores this gets quotes that ignore it too, and the running costs arrive with the first invoice after launch.

Say when the software must be available, what counts as urgent, how fast you need a response, and whether the supplier hosts and maintains it. Ask for running costs per month over three years, separate from the build price.

Example: the support terms Lee Valley Physio asks for

The clinics open 7am to 8pm on weekdays and 8am to 2pm on Saturday. Online booking must be available around the clock. If patients cannot book or pay, that is urgent: a response within one hour in opening hours, please. Anything else can wait for the next working day. Please quote hosting, maintenance and support per month for three years, say what is included, and say how we would move to another supplier if we ever had to.

Timing, budget range and how you will decide

Timing. Give the dates that matter and the reason for each. A reason lets a supplier propose a phased plan that meets the important date with fewer features.

Budget range. A range, not a single figure, for the reasons in the first chapter: it tells suppliers which version of the project you mean. Ask what fits at the bottom of the range and what at the top. The next chapter covers how the money can be structured.

How you will decide. Publish your criteria. It costs nothing, makes proposals comparable, and signals a careful buyer. Include acceptance: who tests before launch and how sign off happens. My own terms for development work say the client tests before launch and gives written sign off. Whoever you choose, put your testing time in the brief so it is planned and priced. The chapter on acceptance and sign off shows how to run it.

A simple way to decide is a weighted score. Give each criterion a weight, score each proposal from 1 to 5 on each criterion, and add up:

S=∑i=1nwi siS = \sum_{i=1}^{n} w_i \, s_i

where SS is the proposal's total score, nn is the number of criteria, wiw_i is the weight of criterion ii (the weights add up to 1), and sis_i is the score from 1 to 5 the proposal gets on criterion ii. It is a weighted mean, explained in Foundations: the mean. Publish the weights in the brief, keep the scores to yourself.

Example: timing, budget and criteria at Lee Valley Physio

Timing. Ballincollig live by 1 April 2027, before the spring rise in sports injuries. Douglas and Blackpool by the end of June 2027. Reception can give two hours a week for testing from February.

Budget range. €45,000 to €70,000 for the build, and up to €700 a month for hosting, maintenance, support and text messages. Please show what fits at €45,000 and what you would add up to €70,000.

How we will decide. Fit with the journeys and must haves (30%), evidence of how you test and release (20%), total cost over three years (20%), who does the work and who is accountable (15%), support and handover (15%). We test before launch and sign off in writing per clinic.

One proposal later scores 4 on fit, 3 on testing, 5 on cost, 4 on people and 2 on support. With Orla's weights:

S=0.30×4+0.20×3+0.20×5+0.15×4+0.15×2=3.7S = 0.30 \times 4 + 0.20 \times 3 + 0.20 \times 5 + 0.15 \times 4 + 0.15 \times 2 = 3.7

where each product is a weight wiw_i times that proposal's score sis_i. The weak support score pulls a strong price down to 3.7, and Orla can see exactly why. The chapter on reading a proposal compares all three.

What to leave out of the brief

Some things that feel helpful get in the way of good quotes.

  • Solutions. "Use plugin X", "like Uber, but for physio". They close off better options. Describe the problem and let suppliers propose.
  • Visual details. Colours, fonts and button shapes belong in attached brand guidelines, not in requirements, unless a choice is a rule (contrast for accessibility, for example).
  • The technical stack, unless you have a reason. If you already run software in a particular language, or have someone in house who will maintain it, say so and why. Otherwise ask each supplier to justify their choice.
  • Wishes dressed as must haves. If everything is essential, nothing is.

Example: three lines Orla deleted

  • "Built in React, because my nephew says it is the best." Orla has no developer in house, so she has no reason to fix the technology. She asks suppliers to explain their choice instead.
  • "Pink buttons like our logo." The brand guidelines are attached, and the accessibility requirement covers contrast.
  • "Patients can chat with their physio in the app." Moved to will not have this time. It is a new service, not part of the booking problem, and it raises questions about clinical advice Orla has not answered yet.

Attachments that save everyone a meeting

A few attachments answer more questions than pages of text, because suppliers see your reality instead of imagining it: screenshots of today's process, a data sample with invented personal details, your price list and money rules, brand guidelines, the counts behind your goal, and who suppliers may talk to. Send the same brief to everyone on the same day, with a deadline for questions, and share every question and answer with all of them. Then watch who asks good questions. That tells you who read it.

Example: what Lee Valley Physio attaches and what comes back

Orla attaches six files: a week of the Ballincollig diary with names blurred, the anonymised samples, the price list (first appointment €60, follow up €52), the cancellation policy, the brand guidelines and the two week tally. She adds: "Questions to rachel@leevalleyphysio.example until 15 January. Every question and answer goes to all suppliers."

Within a week a good few questions arrive. One supplier asks: "Do insured patients ever pay a top up by card when the insurer covers only part of the session?" Some do. Orla adds a requirement with a Given, When, Then example and sends it to all three. Another supplier sends no questions, only a price. She notes it.

Conclusion: the brief is the least expensive part of the project

A good brief costs a few evenings and a two week tally on the reception desk. It saves you from comparing guesses, from finding missing pieces after you have paid for the first ones, and from arguing later about what was meant.

Write the goal with numbers, the users and what each may do, the journeys that must never break, the requirements with examples of done, honest priorities with a clear "will not have" list, every integration, the data you hold, the rules you live under, how the software will be looked after, your dates, your budget range and how you will decide. Send the same brief to everyone, share every answer, and let the questions show you who is paying attention. Comparable quotes are the reward, and the rest of this series builds on them.

If you want a second pair of eyes on your brief before it goes out, book the free workshop: we go through it section by section together, no bother, and the first two weeks of work are on me.

Sources

  1. 1.

    Mountain Goat Software, User stories: what they are, how to write them, and examples, mountaingoatsoftware.com, undated, https://www.mountaingoatsoftware.com/agile/user-stories

  2. 2.

    Ron Jeffries, Essential XP: Card, Conversation, Confirmation, ronjeffries.com, 30 August 2001, https://ronjeffries.com/xprog/articles/expcardconversationconfirmation/

  3. 3.

    Cucumber, Gherkin reference, cucumber.io, undated, https://cucumber.io/docs/gherkin/reference/

  4. 4.

    Agile Business Consortium, What is MoSCoW prioritization? (based on the DSDM handbook chapter on MoSCoW prioritisation), agilebusiness.org, undated, https://www.agilebusiness.org/resource/what-is-moscow-prioritization/

  5. 5.

    European Parliament and Council, Regulation (EU) 2016/679 (General Data Protection Regulation), Article 9, Processing of special categories of personal data, EUR Lex, 2016, https://eur-lex.europa.eu/eli/reg/2016/679/oj/eng

  6. 6.

    European Parliament and Council, Regulation (EU) 2016/679 (General Data Protection Regulation), Article 25, Data protection by design and by default, EUR Lex, 2016, https://eur-lex.europa.eu/eli/reg/2016/679/oj/eng

  7. 7.

    European Parliament and Council, Regulation (EU) 2016/679 (General Data Protection Regulation), Article 35, Data protection impact assessment, EUR Lex, 2016, https://eur-lex.europa.eu/eli/reg/2016/679/oj/eng

  8. 8.

    Data Protection Commission, Data Protection Impact Assessments, dataprotection.ie, undated, https://www.dataprotection.ie/en/organisations/know-your-obligations/data-protection-impact-assessments

  9. 9.

    Minister for Children, Equality, Disability, Integration and Youth, S.I. No. 636/2023, European Union (Accessibility Requirements of Products and Services) Regulations 2023, regulations 1, 2 and 5, electronic Irish Statute Book, 2023, https://www.irishstatutebook.ie/eli/2023/si/636/made/en/print

  10. 10.

    W3C, Web Content Accessibility Guidelines (WCAG) 2.1, W3C Recommendation, 2018, https://www.w3.org/TR/WCAG21/

  11. 11.

    PCI Security Standards Council, PCI DSS, pcisecuritystandards.org, undated, https://www.pcisecuritystandards.org/standards/pci-dss/