An accessible checkout: the critical path for every customer
TL;DR
Difficulty: Intermediate
The checkout is your critical path, and a disabled customer who cannot pass one step leaves without telling you: in a UK survey only 8% of disabled shoppers who struggle ever contact the site.
- Offer guest checkout first, and never block pasting codes or passwords (WCAG 2.2, 3.3.8).
- Announce basket changes with a status region (4.1.3), and keep address fields typeable when the lookup fails (3.3.7).
- Delivery options are one radio group with a legend, and choosing one never submits the form (1.3.1, 3.2.2).
- The payment provider owns its frame and the bank owns its check, but you own the page around them, how you configure them, and a second way to pay.
- Warn before time runs out (2.2.1), put the order number in the confirmation title (2.4.2), and test the whole path by keyboard, screen reader and an automated end to end test on every release.
A customer who cannot get through your checkout rarely complains. They leave, and the abandoned basket looks like a change of mind. This chapter walks the checkout of an invented Galway bookshop step by step with a blind customer, shows what stopped him at each step and the HTML that fixed it, and explains what your payment provider and the customer's bank answer for, and what stays with you under Irish law.
Can every customer actually pay you?
Most shop owners never hear about the customer who could not pay. There is no error in the logs and no angry email. There is only a basket that was filled and then left, and in the analytics it looks exactly like someone who changed their mind.
For disabled customers that silence is the norm. In the Click Away Pound survey of 2019, a UK study, 69% of disabled online shoppers with access needs said they simply leave a website they find hard to use, and only 8% of those who have difficulty ever contact the site owner. The authors put the spending power of the people who click away at 17.1 billion pounds sterling a year in the UK alone1. The mechanism is the same in Galway: the customer leaves, and you never hear why. And the barriers are common: the 2026 WebAIM Million, an automated scan of the home pages of the top million websites, found missing form labels on 51% of them, and a third of all form inputs it detected had no proper label2.
This chapter walks the checkout one step at a time, from the basket to the confirmation. For each step it shows what blocks people, the fix in plain HTML, and who is responsible when part of the step belongs to someone else, such as your payment provider or the customer's bank. Labels, errors and help text are covered in the chapter on accessible forms, so I build on it rather than repeat it.
Example: a Saturday morning basket at Claddagh Books
Claddagh Books is an invented independent bookshop in Galway with an online shop at claddaghbooks.example. Sinéad owns it. Ade is the developer who looks after the site. This series follows them.
Ciarán is a customer, also invented. He is blind and uses NVDA, a free screen reader for Windows3. A screen reader turns the page into speech, and Ciarán moves around with the keyboard: Tab between links, buttons and fields, arrow keys to read, Enter and Space to press. He wants to buy two copies of a local walking guide, one for him and one for his sister.
On Saturday morning Ciarán gets as far as the delivery step, cannot find a way to choose a delivery option, and gives up. He buys the book somewhere else. Sinéad sees an abandoned basket worth €28.00. Nobody tells her why. The rest of this chapter is the list of things Ade finds when he walks Ciarán's route himself, and what he changes.
The checkout is your critical path, so it gets the strictest standard
A critical path is the shortest chain of steps that must work for the business to earn money. I explain the idea in full in the critical path in software. In a shop, the checkout is that path. A broken blog page costs you a reader. A broken checkout costs you the sale.
The accessibility standard recognises this too. The Web Content Accessibility Guidelines (WCAG) apply to every page, but one criterion is written specifically for pages where people commit money: success criterion 3.3.4, Error Prevention (Legal, Financial, Data), at Level AA. It says that when a page causes a financial transaction, the submission must be reversible, or checked for errors with a chance to correct them, or reviewable and confirmable before it is final4. The W3C's own explanation gives the example of an order page that shows the items, quantities, delivery address and payment method so the shopper can check them before confirming5.
The law points the same way, and in Ireland it is specific. The European Accessibility Act became Irish law through S.I. No. 636 of 2023, the European Union (Accessibility Requirements of Products and Services) Regulations 2023. Schedule 1, Part 4, paragraph (g) requires that the identification, security and payment functions of an ecommerce service are perceivable, operable, understandable and robust6, the same requirement as in the Directive itself (Annex I, Section IV, point (g))7. Underneath that, the Equal Status Acts forbid discrimination on the disability ground in the provision of goods and services, and ask service providers to do what is reasonable to accommodate a disabled customer89. The benchmark the EU uses is EN 301 549, which builds on WCAG at Level AA10. I cover who must comply and from when in accessibility law for online businesses. For this chapter, one point matters: the duty sits with the business that runs the shop. Not with the platform, not with the payment provider, not with a plugin.
Example: mapping the checkout at Claddagh Books
Ade writes the checkout down as a list of steps, one line each, before touching any code. That list is the critical path he will test:
- Basket: change quantities, see the total.
- Sign in or check out as a guest.
- Delivery address, with an Eircode lookup.
- Delivery option: standard, next day or collect from the shop.
- Review the order.
- Payment: card details in the payment provider's component.
- The bank's security check, when the bank asks for one.
- Order confirmation.
Then, for each step, he asks one question: can a customer who uses only a keyboard and a screen reader complete it, and know that they have? If the answer is no anywhere, the customer leaves at that step, and everything after it is irrelevant. That is why the diagram below is a chain of gates rather than a list of nice to haves.
Let people buy without making an account
Forcing an account is a barrier for everyone, and a bigger one for some. In Baymard Institute's survey of US online shoppers, 18% named "the site wanted me to create an account" as a reason they abandoned an order, and 17% named a checkout that was too long or complicated11. An account adds a password to invent, often a code to copy from an email or a text message, and one more form with its own errors.
For disabled customers the cost rises. WCAG 2.2 added success criterion 3.3.8, Accessible Authentication (Minimum), at Level AA. It says that no step of signing in may require a cognitive function test, such as remembering a password or solving a puzzle, unless there is an alternative or a mechanism to help12. The W3C's explanation is concrete: let password managers fill the fields, never block pasting, and do not make people transcribe a one time code by hand. A code field split into one box per digit that refuses a pasted code is called out as a problem13.
The fix that removes most of this is simple: offer guest checkout as an equal choice, and offer to create an account after the order is placed, with the details already filled in.
Example: guest first at Claddagh Books
Claddagh's old step two showed a sign in form with "Create an account to continue" underneath. New customers had to register, confirm a six digit code that arrived by email, and come back. The code field was six separate boxes and pasting into it did nothing.
Ade changes three things. First, the step now opens with a plain question, written as a radio group: "How would you like to check out?" with "As a guest" and "Sign in to my account" as the two options, guest first. Second, the sign in form uses proper labels and autocomplete="email" and autocomplete="current-password", so Ciarán's password manager can fill it. Third, the code field becomes a single input with autocomplete="one-time-code" and inputmode="numeric", which accepts a pasted code. On the confirmation page, a guest now sees "Save your details for next time" with only a password to choose.
Ciarán checks out as a guest. He never sees a code at all.
Basket changes must be announced
When a customer changes a quantity, the page usually updates the line total and the basket total without reloading. A sighted customer sees the numbers change. A screen reader user hears nothing, because nothing told the screen reader that anything happened.
WCAG 2.1 covers this with success criterion 4.1.3, Status Messages, at Level AA: a status message must be exposed to assistive technology through a role or property, so it can be announced without moving the user's focus4. The W3C's explanation uses exactly this case: after "Add to Shopping Cart", a message such as "5 items" should be announced as "Shopping cart, five items"14.
The tool for this is a live region: an element that the screen reader watches and reads aloud when its text changes. An element with role="status" is a polite live region, which means the screen reader waits until the user pauses before speaking, and reads the whole message rather than only the changed part15. One detail decides whether it works at all: the live region must already be in the page, empty, before you put text into it. MDN, the browser makers' reference documentation, says the most reliable way is to include it in the initial markup16.
Example: the quantity buttons in Claddagh's basket
Here is what Ade found. The minus and plus are styled div elements with click handlers, the number is a plain span, and the totals update silently:
<!-- Before: not reachable by keyboard, not named, updates silently -->
<div class="qty">
<div class="qty-minus" onclick="changeQty('connemara', -1)">−</div>
<span id="qty-connemara">1</span>
<div class="qty-plus" onclick="changeQty('connemara', 1)">+</div>
</div>
<p>Total: <span id="basket-total">€14.00</span></p>
Ciarán cannot reach the div elements with Tab at all, because a div is not focusable. If he could, his screen reader would announce "plus" with no word about which book. And the new total would never be spoken.
Here is the fix:
<!-- After: a labelled field, a real button, and a status region -->
<form action="/basket/lines/connemara" method="post">
<label for="qty-connemara">Quantity of Connemara Walks by the Sea</label>
<input id="qty-connemara" name="quantity" type="number"
min="0" max="20" value="1" inputmode="numeric">
<button type="submit">Update basket</button>
</form>
<p>Total: <span id="basket-total">€14.00</span></p>
<!-- Present and empty when the page loads -->
<p role="status" id="basket-status"></p>
// After the server confirms the change, say what changed in one sentence
function announceBasket(items, total) {
document.getElementById('basket-total').textContent = total;
document.getElementById('basket-status').textContent =
`Basket updated: ${items} items, total ${total}.`;
}
Attribute by attribute, for a beginner. The label with for="qty-connemara" is tied to the input with the same id, so the screen reader announces "Quantity of Connemara Walks by the Sea" instead of just "edit". type="number" with min and max lets the arrow keys change the value, and inputmode="numeric" brings up the number keypad on phones. The button is focusable and works with Enter and Space without extra code. The form posts to the server, so it still works if the JavaScript fails. And role="status" makes the empty paragraph a polite live region, so Ciarán hears "Basket updated: 2 items, total €28.00" once he pauses. The book, by the way, is invented too.
Address lookup that also works by hand
An Eircode lookup saves typing: enter the Eircode, and the address appears. When it works, everyone gains. When it does not, it can be a dead end. A brand new home may not have its Eircode in the lookup data yet, people often do not know their own Eircode by heart, and a lookup built from a custom dropdown can be impossible to use without a mouse.
The GOV.UK Design System, the UK government's public pattern library, is clear on this: a lookup must make plain what it covers (theirs only works for UK addresses), and there must always be a manual option17. The same holds for an Eircode lookup. It also recommends the autocomplete attribute on each address field, which lets the browser fill the address and helps meet WCAG success criterion 1.3.5, Identify Input Purpose174.
The second rule of this step is about not asking twice. WCAG 2.2 added success criterion 3.3.7, Redundant Entry, at Level A: information a customer already entered in the same process must be filled in automatically or offered for selection12. The W3C's own example is a checkbox that says the billing address is the same as the delivery address18.
Example: the new house Ciarán lives in
Ciarán moved into a newly built house outside the city last year, and its Eircode is not in the shop's lookup data yet. Claddagh's lookup returned "No address found" and showed nothing else. The address fields only appeared after a successful lookup, so there was no way forward.
Ade rebuilds the step so the fields are always there, and the lookup only fills them in:
<fieldset>
<legend>Delivery address</legend>
<label for="eircode">Eircode</label>
<input id="eircode" name="eircode" autocomplete="postal-code">
<button type="button" id="find-address">Find my address</button>
<p role="status" id="lookup-status"></p>
<label for="address-line-1">Address line 1</label>
<input id="address-line-1" name="address_line_1" autocomplete="address-line1">
<label for="address-line-2">Address line 2 (optional)</label>
<input id="address-line-2" name="address_line_2" autocomplete="address-line2">
<label for="town">Town or city</label>
<input id="town" name="town" autocomplete="address-level2">
<label for="county">County</label>
<input id="county" name="county" autocomplete="address-level1">
</fieldset>
<input type="checkbox" id="billing-same" name="billing_same" checked>
<label for="billing-same">My billing address is the same as my delivery address</label>
The fieldset and legend group the fields under one name, so Ciarán hears "Delivery address, group" when he enters it. Each autocomplete value tells the browser exactly what the field is for, so it can offer Ciarán's saved address in one go. When the lookup succeeds, the status region says "Address found and filled in. Please check it." When it fails, it says "No address found for that Eircode. Please type your address in the fields that follow." Either way, Ciarán knows what happened and what to do. And the billing checkbox, ticked by default, means he never types the address a second time.
Delivery options are one radio group with a name
Delivery is a choice of exactly one option from a few, and HTML has a control built for that: radio buttons, grouped in a fieldset with a legend. The W3C's forms tutorial says radio button groups should always be grouped with fieldset19. That grouping is what WCAG success criterion 1.3.1, Info and Relationships, asks for: the structure a sighted customer sees must be available to assistive technology too4.
Built properly, a radio group gives the keyboard user a lot for free. Tab moves into the group, the arrow keys move between options, and the screen reader announces the group's name, the option's name, and its position, such as "2 of 3".
Two details matter. Put the price and the timing inside each option's label, so they are read together with the option. And do not let choosing an option submit the form or jump to another page. That would break success criterion 3.2.2, On Input, which says changing a setting must not cause a change of context unless the user was told beforehand420. A keyboard user moving through the options with the arrow keys selects each one on the way, so an option that submits on change sends them somewhere they did not ask to go.
Example: Claddagh's delivery step, in HTML and in Rails
The old delivery step was three styled boxes that changed colour when clicked. Ciarán's screen reader read them as plain text, and Tab skipped them. This is where he gave up.
Ade's fixed version in plain HTML:
<form action="/checkout/delivery" method="post">
<fieldset>
<legend><h2>How would you like your books delivered?</h2></legend>
<div>
<input type="radio" id="delivery-standard" name="delivery" value="standard" checked>
<label for="delivery-standard">Standard delivery with An Post, €3.90, 2 to 3 working days</label>
</div>
<div>
<input type="radio" id="delivery-courier" name="delivery" value="courier">
<label for="delivery-courier">Next working day courier, €7.90, order by 2pm</label>
</div>
<div>
<input type="radio" id="delivery-collect" name="delivery" value="collect">
<label for="delivery-collect">Collect from the shop in Galway, free, ready in 2 hours</label>
</div>
</fieldset>
<button type="submit">Continue to review your order</button>
</form>
All three inputs share name="delivery", which is what makes them one group where only one can be chosen. The legend names the group, and a heading inside the legend lets Ciarán also find the step with his screen reader's heading navigation. The submit button says exactly what happens next.
Claddagh's shop runs on Ruby on Rails, so Ade writes the same thing as a view with the Rails form helpers:
<%= form_with model: @order, url: checkout_delivery_path, method: :patch do |form| %>
<fieldset>
<legend><h2>How would you like your books delivered?</h2></legend>
<% @delivery_options.each do |option| %>
<div>
<%= form.radio_button :delivery_option, option.code %>
<%= form.label :delivery_option, value: option.code do %>
<%= option.name %>, <%= number_to_currency(option.price, unit: "€") %>, <%= option.timing %>
<% end %>
</div>
<% end %>
</fieldset>
<%= form.submit "Continue to review your order" %>
<% end %>
form.radio_button :delivery_option, option.code creates an input with an id such as order_delivery_option_standard. form.label :delivery_option, value: option.code creates a label whose for points at exactly that id, so each label belongs to its own radio button. The loop means a new delivery option added in the admin area appears with a correct label automatically, and nobody has to remember the accessibility each time.
Payment fields: what the provider owns and what you own
Card details are usually typed into a component supplied by the payment provider. It sits inside an iframe, a small window from the provider's own website embedded in your page. That is good for security, because the card number never touches your server. It also means part of your checkout is code you cannot edit.
So who is responsible for what? Start with what the provider documents. Adyen, for example, publishes an Accessibility Conformance Report (ACR, a vendor's statement of how a product meets each WCAG criterion) for its Web Drop in and Components. It states that they conform to WCAG 2.2 at Level AA from version 6.40.2, and it is explicit about the limits: the report covers only the prebuilt interface in its default rendering, not an interface you build yourself on their API, and customising it, for example by changing colours, can lower contrast below the required level21. The conformance report for a WooCommerce extension that uses Stripe's hosted payment fields makes the same point from the other side: parts of that checkout are controlled by Stripe, not by the shop software around them22.
That gives a fair split. The provider answers for the inside of its frame, as delivered. You answer for everything around it and for how you configure it: the heading that says what this step is, the version you run, the colours you set, your error messages, where focus goes after a failed payment, and a second way to pay. From the customer's point of view there is no split at all. It is your shop.
Example: the payment step around the frame
Claddagh's payment step had a provider component dropped into an otherwise empty page. No heading, no text, and when a card was declined, a red box appeared at the top of the page that no screen reader announced. Ade had also set the component's placeholder text to a pale grey to match the brand, which pushed it below the contrast the provider shipped with.
Ade's new frame around the component:
<section aria-labelledby="pay-heading">
<h2 id="pay-heading">Pay by card</h2>
<p>Your card details go straight to our payment provider over a secure connection.
Claddagh Books never sees or stores them.</p>
<div id="card-component"><!-- the provider's component is mounted here --></div>
<!-- Present and empty when the page loads -->
<div id="payment-error" role="alert"></div>
<button type="submit" id="pay-button">Pay €31.90</button>
<p><a href="/checkout/payment/other">Pay another way</a></p>
</section>
// When the provider reports a declined payment
function showPaymentError(message) {
const box = document.getElementById('payment-error');
box.textContent = message; // e.g. "Your card was declined. You have not been charged. Try another card or pay another way."
document.getElementById('pay-button').focus();
}
The section with aria-labelledby becomes a named region, "Pay by card", that Ciarán can jump to, and the paragraph tells him what the embedded component is before he enters it. role="alert" is an assertive live region, so a declined payment is spoken at once, and focus returns to the Pay button, ready for another try. The button names the amount, so there is no surprise at the moment of commitment. "Pay another way" leads to a second method, such as a wallet or a bank transfer, so a barrier inside one component is never the end of the road. And Ade put the placeholder colour back to the provider's default, because a customisation that lowers contrast is his to fix, not the provider's.
The bank's check is the bank's screen, and the frame around it is yours
In Ireland, as across the EU under the payment services rules known as PSD2, many card payments need strong customer authentication: the customer proves it is really them, usually through 3D Secure, the card networks' protocol for it. Stripe's documentation explains that the requirement comes from the card issuer, the customer's bank, which may ask for a password, a one time code sent to a phone, or confirmation in its banking app23.
The important part for accessibility: the bank controls the screen. Stripe's documentation says plainly that you cannot customise the authentication interface on the web to match your site, because the bank that issued the card controls its fonts and colours. What you can choose is how and where it appears: in a modal dialog above your payment page, inline in the page, or as a redirect to the bank's own site23.
So the inside of that screen is the bank's responsibility, and the way it is opened is yours. If it appears in a layer that keyboard focus never enters, Ciarán is stuck behind it. If it opens in a modal dialog that takes focus and gives it back, he can complete it.
The native HTML dialog element does most of that work. When it is opened with showModal(), the browser moves focus to the first focusable element inside, makes the rest of the page inert so focus cannot wander behind it, and lets the Escape key close it24.
Example: Ciarán's bank asks for a code
Ciarán's bank asks for a code sent to his phone. On the old site, the bank's frame appeared over the page in a styled box, but focus stayed on the Pay button underneath. Ciarán pressed Tab and wandered through the footer.
Ade places the bank's frame inside a dialog:
<dialog id="bank-check" aria-labelledby="bank-check-heading">
<h2 id="bank-check-heading" tabindex="-1" autofocus>Your bank wants to confirm it's you</h2>
<p>This check is run by your bank. When it is done, you will come back here automatically.</p>
<div id="bank-frame"><!-- the provider places the bank's frame here --></div>
</dialog>
const dialog = document.getElementById('bank-check');
function openBankCheck() {
dialog.showModal(); // focus moves to the heading inside, the page behind goes inert
}
function bankCheckFinished(result) {
dialog.close();
if (result === 'succeeded') {
window.location = '/checkout/confirmation';
} else {
showPaymentError('Your bank could not confirm the payment. You have not been charged. Try again or pay another way.');
}
}
The heading with autofocus and tabindex="-1" receives focus when the dialog opens, so Ciarán hears "Your bank wants to confirm it's you, dialog" and knows where he is. The frame's content then belongs to his bank. When the check ends, either he lands on the confirmation page, or the dialog closes and the error is announced with focus back on the Pay button. If a bank's own screen turns out to be unusable for a customer, Sinéad cannot fix it, but she can make sure "Pay another way" is always one step away.
Time limits in the payment step
Checkouts are full of clocks. A basket may be held for a fixed time, a payment session expires, a bank check runs out. Someone using a screen reader, someone who types with a head pointer, someone who needs to stop and rest, all take longer than the person who set the timer.
WCAG success criterion 2.2.1, Timing Adjustable, is at Level A, the basic floor. For each time limit you set, the customer must be able to turn it off, or adjust it to at least ten times the default, or be warned before it runs out and given at least 20 seconds to extend it with a simple action, at least ten times. Real time events, essential limits and limits over 20 hours are exempt25. A limit inside the bank's check is the bank's, but the ones you set are yours. Stripe's documentation for its mobile SDKs, for instance, requires the authentication timeout to be at least five minutes23.
Example: the ten minute basket hold
Claddagh held signed first editions in a basket for ten minutes, then released them silently. Ciarán lost one that way while he was working through the address step.
Ade keeps the hold, because signed copies are scarce, but makes it visible and extendable. Two minutes before the hold ends, a dialog opens:
<dialog id="hold-warning" aria-labelledby="hold-heading">
<h2 id="hold-heading">Your basket is held for 2 more minutes</h2>
<p>Signed copies are held for you while you check out. Do you need more time?</p>
<form method="dialog">
<button value="extend" autofocus>Hold my basket for another 20 minutes</button>
<button value="leave">No, I'm finished</button>
</form>
</dialog>
method="dialog" on the form closes the dialog when either button is pressed and passes the button's value back to the page, which then calls the server to extend the hold. Focus lands on the extend button, so a single press of Enter is the simple action the criterion asks for. Two minutes is far more than the 20 seconds required. And the server lets the hold be extended as many times as needed, which covers the "at least ten times" condition with room to spare.
Review before paying, and errors that say what to do
Success criterion 3.3.4 asks that a financial transaction is reversible, checked, or confirmable4. The usual way to meet it in a shop is a review step: one page that lists the books, quantities, delivery option, address and total, each with a way to change it, followed by the payment step. It helps everyone, and it helps most the customer who cannot glance across a page to spot that the quantity says 20 instead of 2.
When something is wrong, the GOV.UK pattern is a good model: an error summary at the top of the main content, focus moved to it, every error linked to its field, and "Error:" added to the start of the page title so a screen reader announces it first26. The field by field detail is in the forms chapter. The checkout specific part is the round trip: a checkout that validates on the server and reloads the page must still name the problem in text, keep what the customer typed, and put focus on the summary.
Example: the review page catches a typo
Ciarán types "22" as the quantity by mistake. On the review page he hears the table read row by row: "Connemara Walks by the Sea, quantity 22, €308.00". Each row has a "Change" link whose full name, for the screen reader, is "Change quantity of Connemara Walks by the Sea", so he does not hear six identical "Change" links. He follows it, corrects the number, and the basket status says "Basket updated: 2 items, total €28.00." Without the review step he would have found out from his bank statement.
An order confirmation that is announced
The last step is the one that matters most to the customer: did it work? A confirmation page that says only "Thanks!" in large green letters answers that for a sighted customer at a glance. For a screen reader user, the first thing read on a new page is its title.
So the page title and the main heading must both carry the news, with the order number. The GOV.UK confirmation page pattern says a confirmation page must include the reference number, if there is one, and what happens next and when27. WCAG success criterion 2.4.2, Page Titled, at Level A, asks that every page has a title that describes its topic or purpose4.
When the confirmation is a full new page load, the screen reader reads the new title on its own. When the checkout is a single page application that swaps content without loading a new page, the title does not get read automatically, and you need to move focus to the new main heading yourself.
Example: the confirmation page Ciarán hears
<title>Order CB10482 confirmed, Claddagh Books</title>
...
<main>
<h1 tabindex="-1" id="confirmation-heading">Thank you, Ciarán. Order CB10482 is confirmed.</h1>
<p>A confirmation email is on its way to the address you gave.</p>
<p>Your two books will arrive in 2 to 3 working days with An Post.</p>
<p><a href="/orders/CB10482/receipt">Download your receipt as a PDF</a></p>
</main>
// Only for a checkout that changes the page without a full reload
document.title = 'Order CB10482 confirmed, Claddagh Books';
document.getElementById('confirmation-heading').focus();
The title starts with what matters, the order and its state, and ends with the shop's name. tabindex="-1" on the heading lets script move focus to it without adding it to the Tab order. Ciarán hears "Order CB10482 confirmed, Claddagh Books", then the heading, then what happens next. He knows he has paid, for what, and when it will arrive.
Test the whole path, every release
Each fix above can be undone by the next change: a new theme, a provider upgrade, a radio group replaced by prettier boxes. So the checkout is tested as one path, end to end, three ways.
By keyboard, with the mouse out of reach: from the basket to the confirmation, Tab, Shift and Tab, Enter, Space, the arrow keys in radio groups, and Escape in dialogs. You should always see where focus is, never get stuck, and never need the mouse. The keyboard chapter covers this routine in full.
With a screen reader: NVDA on Windows is free3, VoiceOver is built into every Mac and iPhone. Listen to each step. Is every field named? Is every change announced? Do you know at the end that you have paid? The testing chapter explains how to get started with each one and what tools can and cannot find.
As an automated end to end test that runs on every release. Playwright, a browser testing tool, documents how to run the axe accessibility engine inside a test with the @axe-core/playwright package, and says plainly that automated checks catch only some problems, so manual testing and testing with disabled people stay necessary28. How such a test fits next to unit and integration tests is in unit, integration and end to end tests, and the failures worth testing deliberately are in testing the unhappy path.
This is how I build and test too: shops built to WCAG 2.1 AA from the first commit, automated accessibility checks in the test suite on every build, keyboard and screen reader passes by hand on the key journeys, of which the checkout is the first, and sessions with people who use assistive technology where it is warranted.
Example: Ade's checkout test
Ade writes one Playwright test that walks Ciarán's route with the keyboard and checks each step with axe. It runs against the payment provider's test environment, never against live cards.
import { test, expect } from '@playwright/test';
import AxeBuilder from '@axe-core/playwright';
async function expectNoAxeViolations(page) {
const results = await new AxeBuilder({ page })
.withTags(['wcag2a', 'wcag2aa', 'wcag21a', 'wcag21aa'])
.analyze();
expect(results.violations).toEqual([]);
}
test('a guest can buy two books using only the keyboard', async ({ page }) => {
await page.goto('/basket');
await expectNoAxeViolations(page);
// Basket: change the quantity and hear the new total
await page.getByLabel('Quantity of Connemara Walks by the Sea').fill('2');
await page.getByRole('button', { name: 'Update basket' }).press('Enter');
await expect(page.getByRole('status')).toHaveText('Basket updated: 2 items, total €28.00.');
// Guest checkout, no account
await page.getByRole('link', { name: 'Go to checkout' }).press('Enter');
await page.getByRole('radio', { name: 'As a guest' }).focus();
await page.keyboard.press('Space');
await page.getByRole('button', { name: 'Continue to delivery address' }).press('Enter');
// Address typed by hand after a failed lookup
await page.getByLabel('Eircode').fill('H91 X2Y3');
await page.getByRole('button', { name: 'Find my address' }).press('Enter');
await expect(page.locator('#lookup-status')).toContainText('No address found');
await page.getByLabel('Address line 1').fill('12 Example Road');
await page.getByLabel('Town or city').fill('Galway');
await page.getByLabel('County').fill('Co. Galway');
await page.getByRole('button', { name: 'Continue to delivery options' }).press('Enter');
// Delivery: arrow keys move through one radio group
await page.getByRole('radio', { name: /Standard delivery/ }).focus();
await page.keyboard.press('ArrowDown');
await expect(page.getByRole('radio', { name: /Next working day courier/ })).toBeChecked();
await page.keyboard.press('ArrowUp');
await expectNoAxeViolations(page);
await page.getByRole('button', { name: 'Continue to review your order' }).press('Enter');
// Review, then pay with the provider's test card
await expect(page.getByRole('heading', { name: 'Check your order' })).toBeVisible();
await page.getByRole('button', { name: 'Continue to payment' }).press('Enter');
await expectNoAxeViolations(page);
// ...fill the provider's test card fields here, as its own testing guide describes
// Confirmation: the title carries the news
await expect(page).toHaveTitle(/Order CB\d+ confirmed, Claddagh Books/);
await expect(page.getByRole('heading', { level: 1 })).toContainText('is confirmed');
});
Every step finds elements by role and accessible name, the way a screen reader does, with getByRole and getByLabel. If someone removes a label, the test cannot find the field and fails. That is the point: the test fails where Ciarán would have failed. The axe scans catch the mechanical problems, such as a missing label or low contrast, on each page. What the test cannot tell Ade is whether the sentences make sense when spoken, which is why he still listens to the path with NVDA before each release that touches the checkout.
Worked example: Ciarán's checkout, before and after
Here is the whole route as Ciarán met it on Saturday and as he meets it after Ade's fixes, in the order of the map Ade drew at the start. Everything is invented.
| Step | Before | After | WCAG |
|---|---|---|---|
| Basket | Plus and minus were div elements, unreachable by Tab, total changed in silence | Labelled quantity field, Update basket button, status region | 2.1.1, 4.1.2, 4.1.3 |
| Sign in | Account required, six box code that refused pasting | Guest checkout first, account offered after the order | 3.3.8 |
| Address | Lookup found nothing, fields never appeared | Fields always present, result announced, billing reused | 1.3.5, 3.3.7 |
| Delivery | Styled boxes that Tab skipped: where Ciarán left | One radio group with a legend, price in each label | 1.3.1, 2.1.1, 3.2.2 |
| Review | No review step | Table with named Change links | 3.3.4 |
| Payment | Unexplained component, silent error, pale placeholder | Named region, announced error, focus on Pay, a second way to pay | 1.4.3, 4.1.3 |
| Bank check | Focus stayed behind the bank's frame | Frame inside a modal dialog that takes and returns focus | 2.1.1, 2.4.3 |
| Time | Silent ten minute hold | Warning two minutes before, one press to extend | 2.2.1 |
| Confirmation | "Thanks!" and a bare title | Order number in title and heading, what happens next | 2.4.2 |
The following Saturday, Ciarán tries again. He changes the quantity to two and hears the new total. He checks out as a guest. The lookup still does not know his new house, so he types the address in. He chooses standard delivery with the arrow keys, checks the order on the review page, pays, confirms the code from his bank in a dialog that speaks to him, and hears "Order CB10482 confirmed, Claddagh Books." The whole route works by keyboard and by voice. Sinéad has a sale she would never have known she was losing.
Notice also what Ade did not do, and fair play to him for it. He did not install anything that promised to make the checkout accessible. Every change was in the shop's own HTML, its own settings and its own tests, which is the whole argument of this series, and the reason an overlay cannot do this job for you.
Conclusion
The checkout is where accessibility stops being a principle and becomes revenue. Every step is a gate, and a customer who cannot pass one leaves without telling you. Most of the gates are fixed with ordinary HTML: guest checkout, labelled fields, one radio group, a status region, a dialog, a page title that says what happened. The parts you do not own, the provider's payment component and the bank's check, still sit inside your shop, so you choose providers who document their accessibility, configure them without breaking it, frame them properly, and always keep a second way to pay.
Then you prove it, on every release: a keyboard pass, a screen reader pass, and an automated end to end test that fails where a customer would fail. If you run a shop, start with one test this week. Put the mouse away and try to buy something from yourself.